几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 12:00 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 concrete design

concrete design
i am a materials engineer but have been away from concrete design for some while so would appreciate some assistance.
my client wants a 4000psi concrete with a slump of 3 to 4 inches and a water cement ratio of 0.45 the coarse aggregate is granite with a specific gravity of 2.68 the fine aggregate is a manufactured sand with a fineness modulus of 2.2 and a specific gravity of 2.57 whilst the f.m is a bit low i have to work with it. on my initial paper designs the cement and water quantities for a cubic yard both seem high.
thanks in anticipation for the assistance.
look if
firstmix version 2.0
a downloadable mix program -by ravi sikka- can be useful to you. make a google search for it.
look also aci 211
and
graphical approach to mixture proportioning by aci 211.1-91
ken hover
concrete international, sep 95
aci
windies, if you haven't already, reference aci 211.1, "standard practice for selecting proportions for normal, heavyweight, and mass concrete" and pca's "design and control of concrete mixtures".
you didn't indicate what the mix was to be used for (paving, structural, etc), the size of coarse aggregate, admixtures to use (air entrainment, water reducers). the fineness modulus you indicated is kind of "off the chart" on the low end. the pca reference above says astm c33 requires the fineness moduduls to be not less than 2.3 or greater than 3.1 nor vary by more than 0.2 from the value assumed in selecting proportions. it would be good if you could get the fm up a bit - the smaller the aggregate, the more cement you'll need to cover the surface of the aggregates and "glue" them together.
you will need to work with the local ready mix supplier(s) to "tweak" the mix design which may require some trial batches if you have time. if not, see what he has in his "recipe book" of mix designs (with test data) that would be close to what you need.
the aci reference above lays out a procedure for proportioning concrete including approximate mixing water. for 3" to 4" slump, air entrained concrete, the mix water is around 295 lbs per cy for 1" aggregate. keep in mind this water includes the water content of the aggregate (saturated surface dry). if your w/c ratio is 0.45, the cement content is 656 lbs per cy. this seems a bit high. i would look at reducing the cement content to say 605 to 610 lbs but maintain the same w/c ratio. this may reduce workability (which the construction crew doesn't like if the work requires some serious finishing). seriously consider the use of a low range water reducer (astm c494 type a) to keep water content down (5% to 12%) and workability manageable. air content should be 4% to 6% for moderate exposure.
it is also advisable to have frequent if not full time inspection of the work. look at retaining a professional testing firm at least for the initial placements so you establish somewhat of a baseline. then, have someone around who knows a little bit about concrete to look at the slump (or at least see it come out of the chute-someone who's been around ready mix can tell what the slump is by how it rolls off the fins in the drum), take cylinders and to visit the batch plant once in a while to look at the aggregate and watch them batch some trucks. this individual should be retained by the owner. the key is to work out a mix design with the proportions you need and sticking to it. don't let your only measure of quality be compressive strength. you need to look more at durability (low w/c) and exposure, among other things. focus more on what and how much you're putting into the mix. the strength will follow if the proportions are right.
what can blow all your hard work to heck is a contractor adding water at the site because it's not flowing around his boots and no one is there to tell him he can't do that!
briansch
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete design question huangyhg 产品功能分析 0 2009-09-08 12:00 PM
concrete corrosion in partial saturated condition huangyhg 产品功能分析 0 2009-09-08 11:54 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM
calculations personal tool or public record huangyhg 产品功能分析 0 2009-09-07 10:10 PM
anchor bolt design using aci 349 appendix b huangyhg 产品功能分析 0 2009-09-07 11:44 AM


所有的时间均为北京时间。 现在的时间是 02:30 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多