几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-07, 02:07 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 back propping of rc and post tensioned concrete floor

back propping of rc and post tensioned concrete floor
where can i get some information on the above topic? for rc floor system, what would be the procedures for removing or stripping of formwork? for post tensioned floor system, can all the formwork be stripped after the floor is full stressed? would back propping be required?
thanks

your question is in regard to shoring and reshoring reinforced concrete structure. shores are the elements used to support the active level that is being formed and cast, and reshores are the elements used to support and distribute load either to the ground, or to other floors with residual capacity.
the best answer for the above question is to seek the assistance and input of a local formwork/falsework engineer. next best is to further explain the problem.
is you structure a multistory reinforced concrete structure, or are you referring to a single elevated level? there are many parameters to consider.
the methods ao stripping are fairly straight forward. once the level is shored, formed and cast, the concrete is left to cure until the slab has sufficient strength to support itself. the determination of sufficient strength must come from the slabs design engineer, and should be based on analysis of cylinder breaks, additionally supported by knowledge of the mix used. i generally prefer a slab to reach about 80-90 % of it's capacity before stripping, however, the job schedule may not reflect this. as such the concrete mix may be adjusted to give a higher early strength. once the slab has reached it's required strength, it can be stripped in order to allow it to deflect, and carry it's on self weight, or if it is post-tensioned, it may then be stressed if the strength required for stress is also met. if their is only one level, the formwork may be removed by loosening the shoring system, removing the shores and pulling the plyform or forming surface from the slab. if the building is a multistory building, the slab will be stripped and allowed to deflect, and reshores will be placed snugly below the slab, allowing the construction load of subsequent levels to be passed first to the ground and later shared between the residual capacities of several elevated slabs.
as far as references, aci 347 is a document which provides guidelines for shoring operations, and aci sp-4, formwork for concrete is a practical guide to many aspects of formwork and shoring. aci comittee 347 is in the process of finalizing a document to address reshoring as we speak which will hopefully be published in the near future.
let me know if i have helped at all or if i can answer any more questions.
daniel
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
about post installed in concrete huangyhg 产品功能分析 0 2009-09-07 09:28 AM


所有的时间均为北京时间。 现在的时间是 10:38 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多