几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 08:12 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 wharf work platform

wharf work platform
i have to set up a work platform system under a wharf to access the deck soffit for concrete repairs. the wharf is supported on reinforced concrete piles. the piles are an octagonal cross section.
the platform will have to be moved from location to location under the wharf to access damage areas, consequently the cost of placing anchors in the deck soffit will be prohibitive and also will create a site for future corrosion. the concrete pile also cannot have anchors inserted in them for the same reasons.
as a result of this criteria i am considering a system of clamping to a number of the rc piles and then supporting the work platform off the clamps. the local workplace safety authority is very cautious about clamping systems due to the variability of friction coeffecients between the clamp face and the pile and has intimated that the each clamp may require testing each time it is relocated. once again high cost and time intensive.
my question is, does anybody know of similar work platform systems which are available commercially. i would imagine organisations working on the soffits of bridge decks would have encountered similar situations. also i would imagine that organisations working on poles (eg telephone, power) might have some commecially available fixing system to the pole to facilitate support of men or equipment.
any help or comments gratefully accepted.
contact efco. they supply friction collars for round and square columns. we have used wood wedges to fit a round collar on octangonal column.
there are long reach mobile platforms available that reach over, down and under for inspection and repair of bridge soffits.
we commonly use wood/steel friction collars for this kind of work whether repair or new construction. load capacities and procedure are proprietary information. i can give you some hints only if requested by email.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
unbraced length of beam supporting platform huangyhg 产品功能分析 0 2009-09-16 05:01 PM
existing steel column analysis huangyhg 产品功能分析 0 2009-09-09 08:59 AM
better to work for a small or big company huangyhg 产品功能分析 0 2009-09-07 03:40 PM
aluminium support platform huangyhg 产品功能分析 0 2009-09-07 11:13 AM


所有的时间均为北京时间。 现在的时间是 04:56 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多