几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 07:47 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 welded splice connection to transfer the momen

welded splice connection to transfer the moment
i would like to connect two w18 beams together using a welded connection. the web will have a full penetration weld, and the top and bottom flanges will have a certain size plate fillet welded over and centered at the interface of the two beams. it is intended to be a moment connection. my question is analyzing the fillet welds to the top flange, and analyzing the plate itself. i was going to take the moment at the connection point, and turn it into axial (compressive and tensile) loads acting on the welds and plates by dividing it by the the depth of the original beam. so say a w12x58 is the size of the beams being connected and the moment at this point is 120 in-kips, then i would use 10 kips of axial load acting on the weld. is this the only load i need to use to determine length of weld and size of plate i need? should i also add into account shear flow?
check out our whitepaper library.
why not full pen the flanges as well? no design needed. is this a beam splice with the same size beams or are they different sizes.
the web weld will take the beam shear since it is full pen welded. you are correct to calculate the flange force in the beam to size the plate and the fillet weld. the plate should be checked for gross tension and compression. the weld on each side of the joint should just be checked for the flange force. there really isn't shear flow as in two
thanks, that is what i figured.
regarding the full pen welds, we feel it will be difficult to get all of the backing plates installed and lined up properly. part of the beam is being cut out and removed because it is heavily corroded. the new beam will be installed and spliced in place. this beam occurs at an expansion joint, so there is another beam offset about a foot away. this makes it very difficult to access the inside of the joint, so we are trying to limit parts and/or work inside the joint. we actually decided to do a partial pen weld on top and bottom, grind it down, and then put a plate over top of it.
do you need to transfer the full moment capacity? if so, then can you use temp clip angles to bring the surfaces into 'bearing' and use full penetration welds?
if you don't need full capacity, why a full penetration on the web? usually a simple butt weld is sufficient.
can you use end plates welded to each w18? these can be connected using fillet welds. remember that a 3/4" multi-pass fillet weld is normally less costly than a complete penetration. you can then bolt the end plates together with hs bolts.
dik
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
welded moment connection end plate design huangyhg 产品功能分析 0 2009-09-16 07:46 PM
welded connection huangyhg 产品功能分析 0 2009-09-16 07:45 PM
welded connection corner of hss huangyhg 产品功能分析 0 2009-09-16 07:44 PM
urgent - concrete beam to column connection huangyhg 产品功能分析 0 2009-09-16 05:37 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 04:21 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多