默认 vertical crack in fluted cmu

vertical crack in fluted cmu
the building construction (built in 1989) is 12 inch fluted cmu bearing walls with pilasters (24"x24") at 10 feet on center. walls are 28'-0" tall and sit on a 6 feet tall concrete foundation wall. building dimensions are 57'-4" x 46'-8" with a 1 inch control joint at midspan of the 57'-4" wall. no control joint in the shorter wall. wall supports roof joists at 4'-0" on center supporting metal roof deck and membrane roof. no pilaster in corner. first pilaster is approximately 8 feet from corner in both directions.
crack starts at center of 3'-0" door lintel and stair steps over toward corner and then vertical along head joint closest to corner. the edge of door is located approximately 24 inches from the outside face of cmu. it appears that due to wall dimension, head joints for cmu at this location are approximately 2 to 4 inches apart. so the crack goes back and forth between the head joints. the crack is actually in the long wall (has control joint).
typical wall reinforcing consists of 6-#6 pilaster reinforcing and a #6@48 from centerline of each pilaster. which puts two bars 2'-0" apart centered between pilasters. horizontal reinforcing is #12 wire every other course. also, 1-#6 each side of opening and at corners. all bars centered in cells except pilasters, they are out at face.
this building is basically on the beach in outer banks of north carolina.
no signs of settlement in the foundation wall.
any thoughts on the cause of the crack and repair solutions? my thought was that it is due to expansion/contraction. did not verify that reinforcing was installed per above. since wall is primarily spanning horizontally between pilasters and corner wall, wasn't sure it that is actually the case for a vertical crack. would tuck pointing the crack be acceptable? would it just happen again? i wouldn't think you could put a control joint at the crack location since spans horizontal and not vertical.
any thoughts would be appreciated. thanks.
it sounds like a case of poor detailing and/or construction.
because you have head joints at 2" to 4" apart, you have stack bond (officially - other than running bond). in this case, the horizontal joint reinforcement is not spaced close enough. every othe course would be proper in an area such as this. the vertical steel does not effect shrinkage cracks. does the crack cross any vertical steel? - vertical steel next to the door may have been terminated at or just above the door lintel if it was not required for structural purposes.
the door defines a weak area along the length of the wall, so it is not surprising, the crack originated there. near a corner you can also get some very strange loading and stresses that could add to tensile stresses in the wall.
do you have any idea how old the crack is? it may be quite old and a close examination of the crack and any coating may give you a clue.
as an intial repair in light of no other damage, i would open up and tuck-point the joint. if all shrinkage has occurred, this may hold up well despite the nasty winds/storms that the wright brothers loved and put up with. make sure someone watches the joints/crack.
dick
concretemasonry,
thanks for the reply. same building there is a masonry screen wall. same wall construction...pilasters 10' on center, but free top. no drawings showning reinforcing. the wall is pulling away from the pilasters a good 1/2 inch. i can not see any reinforcing tieing the pilasters to the wall. i was going to suggest installing an angle on each side of the pilaster and bolt it to the wall. does that sound like a reasonable fix? or is there something we can do that is cheaper?
i have run into diagonal crack problems in concrete walls where the roof chord member failed during a seismic event allowing the wall to over deflect. from your description, i'm not sure if the crack pattern is the same, but, considering the frequency of hurricanes on the outer banks of the carolinas, maybe... at sometimeim the past 18 years...
when was it first noted?
mike mccann
mccann engineering
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
distressed cmu exterior wall huangyhg 产品功能分析 0 2009-09-08 06:59 PM
cracks in new cmu basement wall huangyhg 产品功能分析 0 2009-09-08 02:27 PM
crack in old floor slab huangyhg 产品功能分析 0 2009-09-08 02:20 PM
crack control huangyhg 产品功能分析 0 2009-09-08 02:19 PM
concrete tanks - vertical construction joints in walls huangyhg 产品功能分析 0 2009-09-08 12:55 PM


所有的时间均为北京时间。 现在的时间是 04:09 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多