几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 10:35 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 strengthing of existing rc columns

strengthing of existing rc columns
i would like to know the methods of strengthing of existing rc columns excluding cfrp method.
thanks
check out our whitepaper library.
one way is to drill and epoxy ties into the existing column. add verticals doweled and epoxied to the foundation and the beam above. add concrete section to column by poured in place methods or shotcreting.
adding prestressing bands around the column or a steel jacket will give have the effect of increasing f'c due to confinement.
regards,
qshake
eng-tips forums:real solutions for real problems really quick.
for bridge repairs in florida, we often use reinforced concrete jackets (6" to 9" thick). this is because of severe section loss, though. also, sesmic resistance is not a consideration.
if your goal is just increasing axial capacity, concrete alone might work (compression only). surface prep and a good bonding agent are a must. once bending starts, the tensile faces will be in trouble.
regards, raf
use an extreeme amount of caution when specifying any bonding agent. i personally try to avoid any procedure that uses more than ssd preparation (surface saturated dry). any bonding agent has to be used in a near-perfect manner or it is useless. any bonding agent applied in an abusive (read: incompetent) manner by a contractor will become a bond breaker.
cheers,
ys
b.eng (carleton)
working in new zealand, thinking of my snow covered home...
in response to the previous email about bonding agents, remember that using cfrp in this instance (axial load capacity increase) is not "bond critical" - it is strictly for confinement and as long as the cfrp layers are lapped sufficiently, this fix will be effective regardless of bond to the concrete. however, a sufficient bond is required for durability of the system. i realize that the original question involved fixes outside of cfrp, but i suggest using fiberglass frp - it will require more layers of material but the fiberglass is close to 6 times less expensive than the cfrp. the fyfe company can help with this design and concept.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
removing existing building column huangyhg 产品功能分析 0 2009-09-15 05:54 PM
raise existing columns 8 inches huangyhg 产品功能分析 0 2009-09-15 04:18 PM
existing steel column analysis huangyhg 产品功能分析 0 2009-09-09 08:59 AM
designing columns for concrete buildings huangyhg 产品功能分析 0 2009-09-08 06:12 PM
coverplating existing columns huangyhg 产品功能分析 0 2009-09-08 02:16 PM


所有的时间均为北京时间。 现在的时间是 06:04 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多