几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 12:10 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 soff-cut saws for sawing slabs on grade

soff-cut saws for sawing slabs on grade
has anyone used a soff-cut saw for sawing slabs on grade? while it is propietary it has some things i like in that sawing can be done within 1-2 hours after placement, cuts dry without water, and due to rotation of blade minimizes raveling. i don't know how many of you are sick of hearing from the contractor he is not going to saw the slab until first thing in the mourning after placing the preceding mourning and then by the time they do get around to sawing the shrinckage cracks have already developed especially in hot weather. here is site for your information, however i want to hear good or bad as i am not promoting this manufacturer and i am sure others will follow suit if is is worthwhile.
i worked for an engineer in australia that specialised in industrial buildings. they specify that the sawn joints for all their slabs on ground are to be soffcut.
you should also use doweled joint every 3rd or 4th joint and pour strips along the sides.
our specification required the contractors bidding our jobs to use soff-cut for sawing contraction joints. if they don't have it, they can rent it.
we have it in the specs, but not by name. i don't recall the exact verbiage, but it basically forces them to use soff-cut. most of the contractors in the area now have it, so it's not the issue it used to be.
it is used every day for residential slabs. even with the blade/process specified, the concrete mix and specifications have to be designed for it to be used at the proper time.
if you use anything to retard the concrete curing (fly ash, etc.) you may put the proper sawing time out beyond a reasonable period if the weather is cool and moist. then, you will have to note the time period in the specifications for it to be reasonably enforced.
the most important thing is to make the depth of the cut about 1/3 of the slab thickness. obviously, reinforcement will have an effect and can overcome sawing.
dick
i specify the soff-cut saw joints on my foundation plans and details for slabs-on-grade. if a contractor doesn't want to saw it at the proper time, he is responsible for the cracking that occurs wherever the owner doesn't want the cracks. if the contractor does it as i specified, it's my problem. generally, i don't get resistance to the saw-cutting with the soff cut. i get resistance to proper curing.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
slabs on grade huangyhg 产品功能分析 0 2009-09-15 11:32 PM
post tesioned slabs on grade huangyhg 产品功能分析 0 2009-09-15 01:50 PM
grade beam detail question huangyhg 产品功能分析 0 2009-09-09 02:57 PM
design of thinner slabs on grade 4 warehouses huangyhg 产品功能分析 0 2009-09-08 05:54 PM
3d correct modeling huangyhg 产品功能分析 0 2009-09-07 08:41 AM


所有的时间均为北京时间。 现在的时间是 11:50 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多