几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 11:26 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 slab on ground contraction joints through thickened slabs

slab on ground contraction joints through thickened slabs
i have a 4000 sf office building with glulam columns forming an inner and an outer ring in the center of a square footprint. the rings are 7 feet apart. the exterior walls are wood stud framed. i have a few interior wood framed shear walls. at the request of the contractor and architect i am using a monolithic slab and footing configuration for the column footings (column reaction is 18 kips max). the interior shearwalls are located on 3 sides of the outer ring and i have a thickened slab under the shearwalls with a footing at each end (also a thickened slab).
now to my question, with all the thickened slab areas, 12 columns in the outer ring, 8 columns in the inner ring, and pretty much 12 inch wide thickend slab under the shearwalls that are between each outer ring column on 3 sides, how do i cut contraction joints in this slab. can i saw them through a thickend slab without increasing the depth of the cut? instead of a 4 inch slab should i go thicker and add more reinforing at the top, cut the joints through the thickend areas and just try to limit the crack width.
or should i completely isolate the thickened areas from the rest of the slab. essentially pour a c shaped footing, top of footing is top of slab, construction joint that where appropriate, then pour the 4 inch slab up to that footing ring?
or am i worrying about it too much. slabs crack, just try to limit the width.

you mention monolithic implying slab and footings in one pour with no construction joints. then you mention a two pour option. if you can go to a two pour option, why not just pour your strip footings to the underside of the slab in one pour, then finish with the slab in a second pour over the footings. cut in your construction joints at the normal depth and spacing and forget it. no worries.
watch the tile areas though. may want to have cj's closer here to limit the slab crack widths. also may want to try to locate the joints at the grout lines, if possible. fibermesh might help here.
mike mccann
mccann engineering
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
metal building thickened slab foundations huangyhg 产品功能分析 0 2009-09-10 01:37 PM
how to thicken an existing concrete slab on grade huangyhg 产品功能分析 0 2009-09-09 05:54 PM
contraction joints in suspended slabs huangyhg 产品功能分析 0 2009-09-08 01:41 PM
contraction joints in slab huangyhg 产品功能分析 0 2009-09-08 01:41 PM
basketball court slab on grade huangyhg 产品功能分析 0 2009-09-07 02:40 PM


所有的时间均为北京时间。 现在的时间是 06:42 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多