几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 10:37 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 sidewalk repair

sidewalk repair
during a tunnel inspection, it was discovered that a portion of the approach sidewalk had a large depression (surrounded by cracks and spalls). the depression in the sidewalk retains water near the wall, and the client would like to come up with a solution that drains the water back towards the roadway. the obvious solution would be to re-grade the sidewalk, but our client would like a simpler and less expensive solution. has anyone encountered a similar problem in the past? if so, what solution did you come up with?
remove the mistake, regrade with suitable compaction and repave with a positive slope. leaving the mistake in place is to allow future failures of the subgrade.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
sidewalk live load huangyhg 产品功能分析 0 2009-09-15 10:36 PM
repair of wood i-jois huangyhg 产品功能分析 0 2009-09-15 05:59 PM
repair by replacemen huangyhg 产品功能分析 0 2009-09-15 05:56 PM
concrete repair in wastewater treatment tanks huangyhg 产品功能分析 0 2009-09-08 12:32 PM
concrete beam repair huangyhg 产品功能分析 0 2009-09-08 11:41 AM


所有的时间均为北京时间。 现在的时间是 05:50 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多