几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 10:28 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 should rfp include estimated construction cos

should rfp include estimated construction cost?
i work for a utility and am preparing an rfp for engineering design services to rehabilitate a large industrial building. based on a previous engineering inspection, a fairly detailed list of anticipated construction items has been assembled. i am including this list in the rfp, but i am debating about including the estimated construction cost (ecc). on the one hand, i think it would help the proposers determine the level of effort. on the other hand, i am concerned that it might encourage the proposers to submit a price based on a percentage of the ecc without fully studying the scope. one of my managers has also expressed a concern that including the ecc in the rfp will influence the construction contractor bids. i did a web search and saw several rfps for design services that did include the ecc.
your opinions would be greatly appreciated.
check out our whitepaper library.
graybeach:
personally, i would not require that rfp responses to include a estimate of construction cost.
you may limit the number and types of companies that will submit a response to your rfp if you intend to solictit seperate bids for the construction.
i work for an engineering company. we can estimate fairly quickly, based on our collective expererience, how much engineering effort will be required in the design. our expectation is, obviously, if we have the best proposal (note: i say 'best', not neccesarily cheapest. they are two entirely different things.) we will be selected. we do not do construction estimating. it would be difficult for us to find a construction company to partner with to do the construction estimating unless they (the construction company) had some expectation that if our 'team' won, they would get the construction contract. if you plan on later solicting bids for the construction, there is no incentive for a construction company to team up with us and spend their time estimating the construction cost. knowing this, we would probably conclude that we are not able to respond to the rfp and would not submit a proposal. i suspect this would be the attitude of a lot of engineering companies. you might fairly quickly limit your pool of available responders. not neccesarily what you want when you are looking for the best proposal.
if you are looking for engineering services and construction services, you would be best served by soliciting a design/build proposal.
jmho. others will likely disagree.
regards.
lkjh345,
we have done an in-house conceptual estimate and believe the work will cost approximately $4,000,000. do you think we should state in the rfp: "the estimated construction cost is $4,000,000 in 2007 dollars?"
this depends upon how well define the scope of work is. if the scope of work is not well defined, include the ecc. if the scope is well defined, the ecc is not necessary. if in doubt about the scope then include it.
graybeach:
i think i would give a range of costs, just so potential engineering responders know if it is something that is in their usual range of work and is not potentially too large for some firms.
i might say 'the estimated construction cost of the project is between $3,000,000 and $6,000,000 in 2007 dollars.'
thats not specific enough for anyone to just put a percentage estimate together, but it also gives an indication this is not a $100,000 project nor a $20,000,000 project.
again, just my opinion.
thank you lkjh345. that is a good point about communicating the magnitude of the project to potential responders. my manager is very much against including the cost, and maybe i can sway him with this argument. at least the rfp includes a fairly detailed scope of expected construction work which may suffice as jike pointed out.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
【转帖】problem with linking the linux sample odreade yang686526 DirectDWG 0 2009-05-06 11:21 PM
【转帖】problem with building example yang686526 DirectDWG 0 2009-05-06 11:09 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM
三十分钟掌握stl yogy vc编程 0 2007-05-18 03:33 PM


所有的时间均为北京时间。 现在的时间是 04:59 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多