默认 required number of anchors mechanical anchoring

required number of anchors & mechanical anchoring
i recall approximately ten years ago, when a pemb company (specifically abc) had changed their rigid frame base plate anchoring from two anchor bolts to four anchor bolts. apparently for some time, the two were acceptable. i do not recall whether the change was a code requirement or revised company standard. likewise, i don't know if a minimum of four anchors is a requirement for any structural columnar framing.
i often need to design hot-rolled lintels supported by hss columns that are within existing wood or cfs walls, to bear on existing concrete stem walls. obviously, cip anchors are out.
the edge distance and spacing requirements of mechanical and adhesive anchors make this a difficult and sometimes a seemingly impossible task, if, four anchors are required. even if only two anchors would be requried, it can be extremely difficult and tedious to comply with all the fastener manufacturer requirements when a significant amount of uplift is concerned.
if there is a code requirement for four anchors regarding specific structural members, please show me where. if not a requirement, i want opinions.
if the lintel/header is fastened/tied to the wall in an acceptable manner as per the eor, why would i need to specify four base plate anchors? the walls themselves are only fastened at 32" oc. granted, as the rigid frames are laterally tied to each other, the wood or cfs walls are typically tied to cross walls and/or a floor or roof structure. but, if the lintel is also sufficiently tied as deemed by eor, to the wall, which is concurrently tied to the other, can two anchors suffice?
what are your thoughts? thank you ...

it is an osha requirement designed to help ensure steel erector safety. the link below gives the section involved. be sure to click on the section designation and read through the three clarification letters to get a better understanding on why this requirement exists.
osha allows two bolt base plates at "posts", which are defined as vertical members which are either not vertically loaded but are restrained by the
daveatkins,
where do you find this exception?
i don't have the osha standard, but this exeception was mentioned in the november 2001 issue of structure magazine.
daveatkins
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
find number ballons - quantity required huangyhg tec-ease(America) 0 2009-09-05 10:42 AM
drawing number system - do you still indicate dwg sie in the huangyhg tec-ease(America) 0 2009-09-05 10:30 AM
【转帖】find number ballons - quantity required yang686526 American standards 0 2009-04-29 07:55 PM
【转帖】drawing number system - do you still indicate dwg sie in the yang686526 American standards 0 2009-04-29 07:45 PM
【转帖】how can i insert the serial number note yang686526 SolidWorks二次开发 0 2009-04-12 09:08 PM


所有的时间均为北京时间。 现在的时间是 08:30 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多