几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 02:45 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 pretension load for guy wire supported flare stack

pretension load for guy wire supported flare stack
any guidelines/formulas/references how to calculate pretension load for guy wire supported flare stack. is it percentage of the cable breaking strength? thank you very much.
check out our whitepaper library.
i've not done any 'big' stacks, but i've not pretensioned other than mildly snug... just adds to compressive loads in the whole length of the stack and these occur anyway in the event there is any movement...
dik
although not directly applicable for stacks tia/eia-222 'structural standards for steel antenna
towers and supporting structures' states "initial tension in the guys, for design purposes, is normally 10 percent of the published breaking strength of the strand with upper and lower limits of 15 and 8 percent respectively. values of initial tension beyond these limits may be used provided consideration has been given to the sensitivity of the structure to variations in initial tension and, if necessary, to dynamic behavior (see note below). consideration shall be given to the site ambient temperature range. in the absence of site specific data, the initial tensions shall be based upon an ambient temperature of 60°f." as found at
thanks, apsix...
dik
cdi12
we use galvanized bridge strand for the guy ropes on our stacks which are pre-stretched by the manufacture to eliminate most of the construction stretch.
the initial pretension that we use is nominally 4.5% of the breaking strength with a minimum of 2.5% in the most unfavorable cold stack/hot ambient combination.
if you have a cold stack condition (stack shrinkage) and a hot ambient temperature (rope growth), the ropes will start to go slack and lose some of the pre-tension. in this condition we want to have a pre-tension of at least 2.5% of the breaking strength.
see pages 36 and 37 in "uss wire rope engineering hand book". you can download this document (zipped .pdf file) from this page of my website
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
partition live load huangyhg 产品功能分析 0 2009-09-15 11:35 AM
moving point load huangyhg 产品功能分析 0 2009-09-10 03:22 PM
load testing huangyhg 产品功能分析 0 2009-09-10 11:14 AM
load combination questionpoll huangyhg 产品功能分析 0 2009-09-10 11:01 AM
effects of a load on sog and below grade huangyhg 产品功能分析 0 2009-09-08 09:45 PM


所有的时间均为北京时间。 现在的时间是 08:54 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多