几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 02:26 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 precast supported by composite steel beams problem

precast supported by composite steel beams problem
we recently had a problem whereby some precast spandrel panels were erected by attaching to the steel floor beams prior to the concrete floor slab being poured. the floor beams are all design as composite steel beams. in one particularly heavy panel, the weight caused excessive deflection in the supporting steel and erection was halted. after looking at it, we told them to pour the concrete slab and allow at least 7 days cure prior to erecting panel.
they are claiming delay and extra cost due to situation. i can't find anywhere where this situation is specifically addressed in our specs. has anyone else had this problem?
i guess we need a note to tell steel erectors how steel buildings work? should the precast specification have something about this?
tw
find a job or post a job opening
you, as the engineer of record, need to either:
1. design the composite beam to account for all anticipated pre-composite dead loads on the beam alone (including the precast) and ensure that it is strong and stiff enough (i.e. serviceable), or
2. design the composite beam for all anticipated pre-composite dead loads on the beam alone (without the precast) and ensure that it is strong and stiff enough and note on your plans your assumption that the precast must be installed after the deck is cured out.
you normally don't dictate on your plans the means and methods of construction, however, you should be cognizant of the probable means and methods, thinking through the constructability of your design.
if structural stability and safety involves a particular sequence then that sequence should be spelled out for the benefit of the contractor.
i don't think it's a one way thing... if the contractor was skilled, the existence of shear connectors should have flagged that the construction was composite or there may be information in the drawing notes that indicates composite construction.
it's common construction to construct the superstructure and then add cladding elements... the contractor should have asked about his sequence, perhaps.
was there any site review? or was it flagged as a consequence of the excessive deflection?
putting precast cladding on a building without making sure the framing system is braced in some way, either poured slabs at each level or temporary bracing, is asking for trouble from those construction gremlins.
i agree with jae that the designer should have notes on the drawings regarding necessary bracing or sequencing during construction. but hopefully it isn't the first time the contractor has been to the dance. he should know the basics of putting a building together too.
it sounds like the finger pointing has started because a problem popped up. preconstruction and pre-installation conferences should be required at the start of each major phase on all your projects. they resolve a lot of questions and prevent most major problems.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
partial vs. full composite steel construction huangyhg 产品功能分析 0 2009-09-15 11:32 AM
incease capacity of composite beams huangyhg 产品功能分析 0 2009-09-09 07:21 PM
heat straightening of steel beams huangyhg 产品功能分析 0 2009-09-09 04:00 PM
beams braced with a welded flat steel plate huangyhg 产品功能分析 0 2009-09-07 03:12 PM
adding studs to existing composite beam huangyhg 产品功能分析 0 2009-09-07 10:13 AM


所有的时间均为北京时间。 现在的时间是 08:49 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多