几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 02:22 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 precast plank cleavage membrane

precast plank cleavage membrane
when the floor finish is a cementitious tile, (i.e. ceramic, quarry, etc) a cleavage membrane, composed of a 0.7(+/-) mil poly, is recommended to separate the concrete topping from bondage to the structural precast plank. thus, it is understood, that the concrete topping is no longer a structural component of the floor system. this separation allows the prestressed plank to undergo anticipated camber "growth", after installation, as well as potential deflection, without forcing the tile, to experience the same structural movements, which would result in buckling, cracking and tearing of the tile and grout.
the question is, if only a portion, say 10 percent of an approximate 50' x 80' floor area is to be ceramic tile, and the rest is to be carpet, does it make sense to provide this cleavage membrane only beneath the tiled area when the balance of the floor areas concrete topping will be structurally bonded to the plank and its' movement?
i realize this may not necessarily be a structural inquiry, but, in my office, i work directly with the architects to prevent such potential problems.
any suggestions? any experiences with this membrane?
thank you ...
find a job or post a job opening
i would want the layout of the membrane to carefully follow the layout of specific planks so that you would avoid having any plank with partial bonded topping.
i'd also want to separate the toppings (bonded and non-bonded) with joints.
the problem is that your plank layout may not specifically follow your floor finish layout so there would be some odd conditions resulting from this layout coordination.
we have gotten away with no cleavage membrane if the tile area is small. if it is over a very small area, the tile would have a hard time arching up due to the plank rotation.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
precast plank camber huangyhg 产品功能分析 0 2009-09-15 02:22 PM
precast drawing liability huangyhg 产品功能分析 0 2009-09-15 02:18 PM
precast concrete plank holes huangyhg 产品功能分析 0 2009-09-15 02:16 PM
minimum bearing for hollow core precast plank huangyhg 产品功能分析 0 2009-09-10 02:07 PM
hollow core plank details huangyhg 产品功能分析 0 2009-09-09 04:45 PM


所有的时间均为北京时间。 现在的时间是 12:29 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多