几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 02:20 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 precast manhole to footing connection

precast manhole to footing connection
i want to get an idea of what others do in this situation.
i have a 25 foot deep (10' id) precast manhole. we are going to put "doghouses" in the bottom so that it can be placed directly over some existing 30" and 36" pipe. a footing will be poured beneath the existing pipe and the manhole will then be set.
my question:
how do others go about attaching the precast manhole to the cast-in-place footing??
additional:
we are thinking about "flooding" the manhole so we can neglect bouyancy. does this change how you attach the two elements??
i have details i use when it's all new (nothing to work around) but this is a little different than what i've done before. thx
check out our whitepaper library.
brandnew,
i have encountered this situation once before. with your situation it will actually work even better because you have an extremely deep manhole of a large diameter.
when casting the bottom of the manhole, allow for a keyway in the top surface. placing a compressible, watertight gasket in the keyway will create an excellent seal. the selfweight of the manhole alone will create a uniform and watertight seal around the entire perimeter. the keyway will also keep the manhole laterally stable on its base. it works quite well and its relatively inexpensive.
good luck.
are you talking just using the typical 2" keyway or a larger one??
i've always poured concrete up around the bottom of the barrel section (bottom foot or so) but this situation doesn't lend itself to that very well.
thanks for the response!!
check with the precast manufacturer to see what size of a key they typically provide on the bottom of their precast sections. you don't want to specify a key with a unique shape or dimensions. i would recommend using a keyway depth that is approximately 1/4 to 1/3 of the thickness.
on my project, i used a 16" thick bottom slab with a 4" key. i've also seen different key shapes: \_/ or |_|
i always prefer to use the first one if possible. cheers.
thanks
when casting the base of this structure make sure the manhole does not rest on the pipe. use a flexible sealer 1 -2 inches thick to keep the load off the pipe. using a bentonite rope under the manhole will be all the seal you need. also excavate all the way down past the bottom of the pipe to get bearing on native soils. you don't know if the original installation was subcut too much.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
pci connection details huangyhg 产品功能分析 0 2009-09-15 11:44 AM
how far is it righ huangyhg 产品功能分析 0 2009-09-09 05:27 PM
footing is too small for residential addition1 huangyhg 产品功能分析 0 2009-09-09 01:04 PM
demolition of existing wall footing to install column huangyhg 产品功能分析 0 2009-09-08 05:07 PM
beam connection to precast wall huangyhg 产品功能分析 0 2009-09-07 02:48 PM


所有的时间均为北京时间。 现在的时间是 06:48 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多