默认 post tensioned floor slabs

post tensioned floor slabs
i'm currently carrying out a code compliance check of a multistorey building that has 9" pt floor slabs. unfortunately i only have an academic understanding of pt slabs. are there practical issues in terms of the drawing design details etc that i should be aware of. i have already read with interest y3392 problems with hairline cracking on a former thread.
many thanks
hannis
check out our whitepaper library.
hannis,
i would recommend looking at 鈥淒esign fundamentals of post-tensioned concrete floors鈥?published by pti. it has a wealth of information on design practice and detailing which may be helpful in you quest. it was written by bijan o. aalami, an authority on pt design.
regards,
auce98
hannis was right on the point -
other than reading "design fundamentals of post-tensioned concrete floors"
you could also look at "design, construction and maintanance of cast-in-place post-tensioned concrete parking structures"
some tips -
1. always check the deflection of selfweight+pt combo, to ensure you do not get excessive camber.
2. dont over post tension your slab. but, at the same time, also try to minimize use of bottom mild reinforcement (conventional rebar) by increasing the tendons profile or increase number of tendons.
3. always show required anchorage reinforcement, if not shown, at least call out or mention to refer to pt supplier's dwgs. they are very important.
4. check tendon spacing at middle and at anchorage. sometimes, you may end up putting the number of tendons that is not constructable simply because you dont have anough space for anchorage.
5. if you are using comp. software, like adapt or floor to do your design, aways check your model with the real situation, i.e. boundary conditions, extension of columns, walls, anchorage height,etc.
lutein/auce98
thanks very much, the advice and tips are helpful.
regards
colin
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
hairline cracks in post tensioned slab huangyhg 产品功能分析 0 2009-09-09 03:43 PM
deck-railing post connection huangyhg 产品功能分析 0 2009-09-08 04:37 PM
cast-in-place vs. post-tensioned huangyhg 产品功能分析 0 2009-09-07 11:05 PM
can we cut a post tensioned deck huangyhg 产品功能分析 0 2009-09-07 10:25 PM
book reference on design of post tensioned floors huangyhg 产品功能分析 0 2009-09-07 04:24 PM


所有的时间均为北京时间。 现在的时间是 06:14 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多