几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 12:01 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 pemb no slab

pemb no slab
new pre-engineered metal building with no slab, 100' clear span. the contractor wants tie beams, not large footings. i'm thinking that dead-men along the tie beams will put the thrust back into the ground. any other ideas????
when the earth moves, wouldn't the embedded deadmen go along with the movement in a random manner?
fwiw:
one idea, if your running grade beams between columns under the perimeter of the building (perpedicular to the main span direction), make the grade beams strong enough and stiff enough to act with the footing to resist column thrust. if your in an area where you have to go deep for frost anyway, its a way to pick up quite a bit of passive soil resistance without a whole lot more work or materials.
just an idea.
tie beams parallel to the frames, (connecting the columns), are a good idea for taking the horizontal thrust. place pvc sleeves through the beams for plumbing and other buried utilities.
you dont even need tie beams. consider running two bars running perpindicular to the frames in pvc tubes. anchor bars to column pier. tension with turnbuckle. grout pvc solid to protect bars.
this procedure is outlined in several pemb design books. check it out.
there are inward forces and outward forces, tie beams across the building seem more appropriate. i was considering that the building might try and move laterally with wind, with the tie beam soil friction and footing overturning/sliding keeping the building in place. if the above is not adequate, then possibly cutting a 'deadman' along the tie beam to resist additional load. am i missing something?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
pemb net uplift and thickened slab footings huangyhg 产品功能分析 0 2009-09-15 12:01 PM
metal building thickened slab foundations huangyhg 产品功能分析 0 2009-09-10 01:37 PM
how to thicken an existing concrete slab on grade huangyhg 产品功能分析 0 2009-09-09 05:54 PM
hairline cracks in post tensioned slab huangyhg 产品功能分析 0 2009-09-09 03:43 PM
crack in old floor slab huangyhg 产品功能分析 0 2009-09-08 02:20 PM


所有的时间均为北京时间。 现在的时间是 12:19 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多