默认 minimum steel for crack concrol

minimum steel for crack concrol?
is there a minimum steel requirement for temp. & shinkage cracking in a residential slab on-grade (stemwall foundation)? in place of 6x6" 10/10 w.w.m., i would like to use #3 reinforcing bar grid but not sure of spacing?
thanks
there is no need for any reinforcing in a slab-on-grade, if you saw control joints into the slab at a close spacing (36 times the slab thickness, maximum). #3 at 48" oc each way would give you approximately the same area of steel as wwf 6x6 - w1.4xw1.4 (the correct designation for 6x6 10/10 wwm).
daveatkins
if you're going to use #3 rebar, i wouldn't go any further than 18"oc with the rebar, since local cracks may form. that's why wwf works well because the grid spacing is close.

a better way for residential construction is to add fibermesh to the mix. good crack control and no hassle of placing reinforcement.
i have found in residental construction flat work, the wire or fiber contibutes little. typically the wire is walked on pushing it to the bottom of the slab. i have removed dozens of slabs and driveways and found the rusting wire presses into the poly.
if you are trying to reduce temp. & shinkage cracking i found the most common reasons for cracking were:
1. excess water in the mix (no water added on site)
2. rapid drying or improperly curing concrete slabs (subs often want to pull forms the day of the pour, use a cureing top coating)
3. lack of control joints.
4. sub grade must be prepared according to your soil conditions (i see all the time sites dumping truck after truck putting the fill in 3 ft lifts, limit to 8" compact between lifts)
hi civeng95:
i like #4 bars at 12" c/c each way. workers can step in the open spaces without pushing the bars to the bottom of the slab. put chairs at 36" max each way. lap all joints. stagger all joints.
rebar is not very effective once it is spaced more than 3x the slab thickness (i.e. 12" on center for a 4" slab). however, you could get away without reinforcing if you keep the water in the mix low and cure it properly.
i usually show a 6x6 w1.4xw1.4 reinforcing on 4" residential type basement slabs.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
minimum reinforcement on grade beams huangyhg 产品功能分析 0 2009-09-10 02:16 PM
minimum 9as0 reinforcing steel in footing huangyhg 产品功能分析 0 2009-09-10 02:05 PM
how to place minimum steel in a rectangular footing huangyhg 产品功能分析 0 2009-09-09 05:50 PM
heat straightening of steel beams huangyhg 产品功能分析 0 2009-09-09 04:00 PM
aci minimum area of steel huangyhg 产品功能分析 0 2009-09-07 09:58 AM


所有的时间均为北京时间。 现在的时间是 06:14 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多