默认 masonry stair tower cc loads

masonry stair tower c&c loads
when designing an 8"cmu 21ftx15ft exposed stair tower, five stories tall, how would i go about reinforcing the wall for c&c loads on the 21ft face in a 90pmh wind zone? it would seem that i would have to place bond beams every other course to span horizontally.
i'd rather not reinvent the wheel here, so i'd appreciate any suggestions.
hate these abbreviations. what are "c&c loads"? but if you are just talking about wind loading, why can't you brace the walls with the stair landings to cut down your span?
try to place bond beams at some appropriate spacing - perhaps 4 ft. to 8 ft. on center and design the walls to span between bond beams, and design the bond beams to take those tributary loads and span to intersecting corners.
this is probably a total rookie question, but if you have a 5-story high, rectangular box wall, won't the wall want to span horizontally between the endwalls instead of vertically?
if you do tie the wall to the stair landings, i would think that you would get a lot more two-way action than spanning simply from landing to landing.
21 ft seems like a pretty long span for a bond beam what kind of wind loads are you getting? does the building code in your area allow for the 1/3 increase? you could also try spaning the masonry vertically to a concrete beam at mid height, and seeing if that will work. you might need a wide beam though.
yikes...ash060 - you are right - i failed to see the 21' dimension. that is pretty long for an 8" cmu bond beam....even for a 12" cmu.
tricky problem.
can you talk the architect into allowing a steel girt at each floor? i mean, on the inside of the cmu.
daveatkins
i suggest using the landings and stairs to brace the walls. i suggest placing bond beams just beneath each landing all around the perimeter.
you may have to look at several locations to determine the maximum wall height. you may still have to reinforce the walls vertically depending upon the floor to floor height.
good luck!
what i have done in the past, not necessarily for stair towers (and i agree that it is not the best solution - masonry contractors hate it and it tends to slow construction down) is to provide horizontal concrete bond beams at whatever spacing is required. you can play with the concrete strength as required to get your spans and strength required. just recently, i used it on a high school fine arts theatre where the cmu walls were 50 feet tall. i spanned horizontally between pre-cast concrete pilaster/columns spaced about 22' apart using concrete bond beams at 48"o.c. vertically. in my case, the exterior auditorium walls were to be painted and the architect used the bond beams as accent stripes at various levels.
galambos:
i have encountered this situation several times in the past.
my method is to design the section of the wall between landings to span horizontally. by assuming a span from edge of landing to edge of land (in plan view) i get a span somewhere around 14 feet or so. this is doable with 8" bond beams. don't forget to include the are of steel in your joint reinforcing in your calculations. it is small, but every little bit helps.
i then design vertical 'strips' the width of the landing to carry the load vertically between the landings.
this assumes that the landings can either transmit this horizontal force into the larger floor slab diaphragm (at the landing at floor elevation) or can carry the horizontal load into the masonry wall that is on the short side of the stair tower at the intermediate landing by some means of attachement.
this method appears rational to me.
regards.
lkjh:
your description didn't mention it but i assume that you then put a large vertical element at the end of landing (where the stairs connect) to carry the reaction component from the 14 foot horizontal span. the vertical element needs to transfer those forces to the landings above and below.
i prefer to have the wall continuously connected to the landings and stairs with intermittent clips. i then don't have to deal with trying to span the wall horizontally.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
masonry cemen huangyhg 产品功能分析 0 2009-09-10 12:28 PM
intl bldg code wind loads huangyhg 产品功能分析 0 2009-09-09 09:19 PM
in enercalc masonry wall design, what is parapet heigh huangyhg 产品功能分析 0 2009-09-09 07:17 PM
help on stress analysis of lattice tower huangyhg 产品功能分析 0 2009-09-09 04:14 PM
fea on conrete slab - use real loads or factored loads huangyhg 产品功能分析 0 2009-09-09 11:24 AM


所有的时间均为北京时间。 现在的时间是 12:19 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多