masonry parapet detail question
we have a parapet wall of 8" masonry. the top of the wall was a u-block bond beam. we have been asked if the vertical steel needs to be hooked into the bond beam. our opinion is no, but we cant find any code reference one way or the other. we are using fbc2001 in a 130 mph hurricane zone.
any thoughts on hooking the vertical bars into the bond beam?
thanks.
as long as the unreinforced cmu can resist the wind load on the top 8" of the wall (and i have to believe it can), you should be ok.
daveatkins
whenever i have vertical reinforcing in any exterior masonry wall, i always specify the vertical bar to extend a minimum of 4" straight, without a hook, into the bond beam at the top of the wall. this is not a problem for the masons to punch a hole throught the bottom of the block. this will make the bond beam part of the structural cantilever of the wall to aid in the resistance of lateral loads.
i see no reason to hook the rebar. my only thought is, if i am understanding this correctly, the hook would only prevent the bond beam from lifting away from the rest of the wall. and with forces that great, i believe you are dealing with tornado-like conditions.
the top hook is usually a designers option. i know several that do and several that don't. the masonry design manual published by the masonry institute is a good guideline and it does not require a hook. your area may have a local code requirement for such.
thanks all for the super quick responses. it seems that we generally agree that hooking would not be required, unless you have some very large uplift load on the bond beam.
in this case, my uplift would be something like 85 psf worst case. so on an 8" wall, with say a total width of 12" (architectural capping etc) i would have maybe 85 plf of uplift. i have #6 bars @ 32" o.c. extending up into bond beam. if i have 4" embed depth into beam, i would have an allowable tension capacity of about 3600 lb per #6 bar (4" / ld * 60 * 0.44). so i guess i have lots of capacity to resist the bond beam from lifting off the wall.
thanks again everyone.
does a 4" embeddment actually develope the rebar adequately?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
masonry cemen huangyhg 产品功能分析 0 2009-09-10 12:28 PM
in enercalc masonry wall design, what is parapet heigh huangyhg 产品功能分析 0 2009-09-09 07:17 PM
how to put a door into existing masonry wall huangyhg 产品功能分析 0 2009-09-09 05:52 PM
arching of masonry walls huangyhg 产品功能分析 0 2009-09-07 12:41 PM
2002 masonry code question huangyhg 产品功能分析 0 2009-09-07 08:25 AM


所有的时间均为北京时间。 现在的时间是 02:48 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多