默认 load to a.b

load to a.b.
i am using this detail as a hold-down at the end of a shear wall. i got a comment on how i determined the load in the bolts; i tried a few different methods and got fairly close results. i was just curious on how you guys would determine the load in the bolts.
i'm not really sure what i am looking at, plus the material and orientation... where is the shear wall with respect to this?
mike mccann
mmc engineering
sorry i thought i wrote more, it has been a long month.
at the end of a shear wall, i am using the hss as a hold-down. this condition occurs at the end of a footing inside the wall on top of a curb. therefore, i am unable to space out the a.b. to get an even distribution, so i was wondering what method would you guys use to determine the load to each of the bolts.

i am assuming this is a plan detail, is that true? how are the anchor rods attached to the hss - are you using a thick plate?
i would probably use an equal number of anchors on both sides of the hss.
check prying action to get the tension in the closest anchor bolt. i wouldn't count on the other three to resist any tension. the right-hand sketch in fig. 9-4, page 9-10 of the 3rd edition steel manual, shows a configuration with a one-sided bolted connection resisting tension.
if the plate was thick enough, there wouldn't be any prying effects, and the tension in the closest anchor could be taken as the tension in the column.
i wanted to use an even number of bolts that was not possible at the time; we have since changed the detail. yes the first one is a plan view the second is an elevation; a plate is used to transfer the load. thanks i figured the aisc prying would be the one that would come up. anyone else have a method they use?
this is a zipper situation where failure of the first row is the only way to load the next row. the first row must be able to take the entire tension load plus prying forces.
if you "heard" it on the internet, it's guilty until proven innocent. - dcs
first bolt carries all the load.
add 30% for prying.

i disagree that the first bolt takes all the load. how much it takes is dependent on the stiffness of the column and the plate. but i do agree that it is a poor detail.
you can assume whatever you want about how the load is resisted, but you must be consistent. if you assume all the bolts are loaded equally, you must design the base plate for bending (which should not be a problem) and design the steel hss post to throw the bending induced back into the shear wall via the plywood (which could be a problem).
eccentrically loaded holddowns are frowned upon because of the moment created.
daveatkins
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
load testing huangyhg 产品功能分析 0 2009-09-10 11:14 AM
load testing wood structure huangyhg 产品功能分析 0 2009-09-10 11:14 AM
load distribution to three supports due to concentrated load huangyhg 产品功能分析 0 2009-09-10 11:04 AM
load combination questionpoll huangyhg 产品功能分析 0 2009-09-10 11:01 AM
effects of a load on sog and below grade huangyhg 产品功能分析 0 2009-09-08 09:45 PM


所有的时间均为北京时间。 现在的时间是 06:54 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多