几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 01:21 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 fortress stabalization systems

fortress stabalization systems
has anyone used this company's products to repair a foundation wall? a home owner has asked me for a repair method other than casting pilasters or using tiebacks. this company has developed very strong kevlar strips that act as tensile reinforcemnt - they are glued to the exisitng concrete.
check out our whitepaper library.
why? the basement wall is curving?
2" bow over 50'. 45 degree cracks near the end. the excavator backfilled the wall before the house was built, he should have waited.
they should have shore the top before backfill. so you are saying, they already built the house? so they built the house on bowed wall? i think you are going to make the house even worse if you pull the wall back since everything is built on bowed foundation wall. i hope the house isnt built.
the house is not built yet, we are going to fix the foundation wall before building the house
i think whatever method you are using, you have to take the backfill out anyway. once you take it out, the wall can easily be pushed back. shore the wall, back fill it, built the house. once you have the floor installed, you can take the shoring off.
right now we are looking at installing some temp shoring (turnbuckles) to push the wall back to plumb. the issue is complicated slightly because the owner has installed radiant heating in the floor so we can't just drill into the floor later.
i also told him we could install several tie backs anchored to concrete deadmans to pull the wall back. so now he has three solutions to choose from. meanwhile he does not want to pour his floor unitl we have settled on a solution.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
dual systems huangyhg 产品功能分析 0 2009-09-08 07:52 PM
aerospace hydraulic systems references huangyhg 精密机械 0 2009-09-05 10:14 PM
any have any perfect part numbering systems huangyhg tec-ease(America) 0 2009-09-04 04:40 PM
【转帖】any have any perfect part numbering systems yang686526 American standards 0 2009-04-29 06:23 PM


所有的时间均为北京时间。 现在的时间是 12:26 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多