默认 field weld on residential beam

field weld on residential beam
as part of an arbitration proceeding, an inspector testified that he encountered a field weld on a steel beam at the dwelling in question. from a code persptive, which code governs this type work? (dwelling was contructed under irc 2000) i assume there must be a requirement to have a p.e. 'certify' to the adequacy of the weld? the steel supplier was not involved as the builder took it upon himself to cut/splice the beam as he saw fit. any input is appreciated.
find a job or post a job opening
there is no requirement i know of for a pe to "certify" the weld quality. this is normally done by a structural testing firm specially engaged to perform a "special inspection", but only when it is required by the engineer of record or local jurisdicction.
questions: did the contractor have a current welding certificate with the proper qualifications to make the type of weld seen? was he licensed and bonded to do this? what type of weld was it? a fillet, or full pen butt weld with backing bars? what electrode was used and what steel? where in the beam was the weld made? there a lot of questions here. he should be able to answer all of them.
please do not be offended, but for anyone to blindly hold an engineer responsible for the actions of a contractor, who, in all likelihood, did not want the engineer involved as he would complicate the "solution", is ludicrous in my mind.
yes, i am reading between the lines here, but speaking from experience. not admissable in court, but an indication of where to look harder for that admissable evidence. just my two cents.
mike mccann
mmc engineering
for residential construction, pe's are not usually required to be involved unless there is some design aspect that is not empirically provided for in the irc. in the case of a weld on a beam, if it was a secondary weld, attaching something to the beam, it may not be a requirement. if it was a total beam splice, then the building official should have required some sort of pe review.

i agree jae about not being empirically provided for in irc, it isn't, that is why more information is being requested from the builder, even though the local code official did not request it (there is no question he should have) the problem at this stage msquared48 is that we have no information on what was done. no one is suggesting blindly holding a pe responsible for this work. there are many unanswered questions and the builder has been come down with a bout of amnesia. regarding a pe being 'on the hook' we have the opposite problem. the builder's engineer opined that the beam 'is fine' yet provides no back up documentation, calcs. etc. this constitutes a net opinion and carries no weight. while common sense tells us that someone should have been overseeing the work or should have run the calcs before hand, there is no code requirement we can locate that tells us that. lawyers love code references.
thanks for the input.
check with your state building officials. there was a state building code in place. it probably required calcs for everything that's non prescriptive and i'll bet this was non-prescriptive. it alos probably requires who ever di this to have the calcs on file for about 5-7 years.
let us know how this turns out,
good luck,
dermott
welding isn't necessarily detrimental to an in-place piece of steel. engineers usually don't like to see welds because who knows how qualified the welder and procedure was but the presence of a weld isn't the end of the world.
i do not have the 2000 irc or had much experience with it, but in the 2003/2006 irc, you refer to the 2003/2006 ibc for things not following the prescriptive provisions of the irc.


don phillips
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cross beam bolted connection huangyhg 产品功能分析 0 2009-09-08 03:55 PM
bending calculations for non-typical beam situation huangyhg 产品功能分析 0 2009-09-07 03:25 PM
beam strengthening huangyhg 产品功能分析 0 2009-09-07 03:04 PM
12 x 6.5x 38 thick x 41 residential basement i-beam con huangyhg 产品功能分析 0 2009-09-06 10:30 PM
10 ft continuous weld beam to cover plate huangyhg 产品功能分析 0 2009-09-06 10:26 PM


所有的时间均为北京时间。 现在的时间是 06:10 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多