几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 11:28 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 fees

fees
i do some foundation design for pre-engineered metal buildings. i am wondering what type of fee others are getting for this type of work. usually, my hourly rate for this type of work dosen't generate enough money to cover the libility that i'm exposed to. i have heard of others using a per sq. ft. price. is anyone else doing this and what rate are you using?
a lot of engineers use a percent of the construction cost of the portion they design or are responsible for.
so for your foundation design, you'd try to figure out the cost of the earthwork, foundation excavation, foundation, anchor bolts, backfill, slab-on-grade floor, etc. and get a cost for that.
then you can determine a cost of the building frame itself. now you probably aren't designing the frame, but in most cases, the engineer who does the footing is the engineer of record and thus responsible for the whole structural system. so you should be paid for that responsibility. you can take this cost and apply perhaps a bit smaller percentage -
many engineers use between 0.75% and 2% of the construction cost...usually toward the lower end of that range.
so perhaps you charge 1% to 1.5% for the foundation and 0.75% for the frame above to get a total fee. this is simply one way of many, but you are correct: they liability is on you so you should be compensated for it. even if they say "oh, you're just doing the footing and not the eor" - if the building fell down, they'd come after you in a heartbeat.
four common methods are:
1. percentage of construction cost
2. number of sheets times cost per sheet
3. square feet of structure times design cost per square ft
4. number of hours times direct expense cost times a markup
i typically perform all four, then make a judgment. additional factor to consider (if you have competitors, consider what they may charge and determine your own fee accordingly).
i am totally against lowest bidder concept but you may not get the job...
this topic has been discussed in previous threads. do a search on design fee. there was a link that was helpful for me in one of these posts:
for work in general, i usually get 10% of the architect's fee. if he gets 10% of construction cost, then that makes me at 1% of construction cost.
zweig-white indicates that structural should be about 17% to 21% of the architectural fee.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
fees for structural indusrial design huangyhg 产品功能分析 0 2009-09-09 11:28 AM
fees for shop drawings huangyhg 产品功能分析 0 2009-09-09 11:27 AM
engineer fees for site adaptmultiple buildings huangyhg 产品功能分析 0 2009-09-08 10:25 PM
design fees in saudi arabia huangyhg 产品功能分析 0 2009-09-08 05:20 PM
【发布】Guide to Fees and Payments huangyhg 无为塔(留学) 0 2005-12-02 03:59 PM


所有的时间均为北京时间。 现在的时间是 08:59 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多