默认 driven piles...energy per blow and se

driven piles...energy per blow and set
hi guys,
i haven't dealt too much with the design of precast driven piles but today i was given the job of specifying the hammer mass, drop height and set of a driven pile.
i spoke to a piling contractor over the phone to try and determine a generic hammer mass and drop height, only to be told it depends on a number of factors and the contractor needs to know more specifics of the job before they can give an answer.
basically, the mass of my pile is 12 tonne (26,400lbs) and i was thinking of using a 12 tonne drop hammer. if i drop it from a height of 900mm (3ft) and using a efficency factor of 0.95, this gives me a energy per blow (10.3 tonne meters). my question is:
how do i know what energy input per blow is required to drive the pile? i am driving through silty clayed sand down to weathered sandstone (rock).
i am also required to specify a pile set which is given by a hiley formula:
s=9800x(mm+e^2*(mf+mp))/(mm+mf+mp)*e/r-0.5*c
where

mm=hammer mass
mf=mass of pile helmet
mp=mass of pile
e=co-efficient of restitution, 0.25 to 0.4
e=energy input per blow (calculated above)
r=minimum ultimate capacity of pile (3200kn)
c=combined temporary compression of the helmet cushions, pile and adjacent ground in millimeters.

check out our whitepaper library.
i'd advise that you consult a local or the project geotech
asixth - msucog is right. also, on many projects selection of the hammer is left to the contractor (with approval by the engineer). this helps to increase bidding completion since various contractors have (cost-effective) access to different equipment
however, if you have to do this project yourself, a good place to start is with the us army corps of engineers publication, "pile driving equipment". a free download at this link:
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭



所有的时间均为北京时间。 现在的时间是 03:26 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多