几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 06:35 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 diaphragm action question

diaphragm action question
i am new to structural field and looking for the principle involved in my following question?
1. as far as i know, steel deck is supposed to transfer the lateral forces to perimeter walls thru diaphragm action. i am talking about 22 ga. 1-1/2" deep 3 span cont. deck in a steel frame warehouse type structure.
but some engineers show horizontal roof bracing along the perimeter in addition to roof deck. what is the purpose of this bracing?
2. deck supplier( canam) catalogue show tables in which deck can be spanned upto 8' c/c, but practically nobody is using joist c/c span > 6' or 6-6" for design of deck( for 22ga. 3-span continuous deck). why is it so? why can't i use 8' span for deck?
1. buildings that you see horizontal bracing in the roof do not have roof deck acting as the diaphragm. the lateral load is being collected by the bracing which distributes it to the walls and whatever system is being used there for lateral support.
2. check the vertical capacity of the deck. 8'-0" is a stretch. also check your joist depth. spacing joists at 8'-0" o.c. will increase the depth of the joist. it is a balancing act between structural requirements, economy, and building requirements of the architect, mechanical engineer, electrical engineer, and owner.
good questions. as far as the local lateral bracing, it's possible they are defining subdiaphragms as required in asce 7-02. maybe someone else can add to that. the reason the spans are limited to 6'-0" or 6'-6" has a couple of possibilities. for one, factory mutual only covers 22 gage 1 1/2 deck spanning less than 6'-1". i've never had that explained to me very well, but i hear it's a good idea not to exceed it. also, just because the deck capacity is acceptable for ll + dl doesn't mean that some beefy construction worker carry a tool belt and a roll of roofing material isn't going to exceed the capacity.
if bracing is used in the plane of the roof, it may be that the diaphragm is being ignored or perhaps the load or deflection of the diaphragm exceeds the capacity. it seems to be more cost effective to use more fasteners closer to the perimeter. don't forget that alot of large roof openings take away from the diaphragm's ability to transfer load.
the 6'-0" and 6'-6" limit of the deck span comes from fm (factory mutual underwriter) requirements. i understand that some studies were done for a workman on the roof with a fully loaded wheel barrow. this is the maximum deck span at which built up roofing would not tear when subjected to that load.
i do not recommend exceeding that span limit even if it is a building not underwriten by fm. i believe fm allows you to go 6" beyond those limits to obtain equal joist spacings in a bay. i thought 6'-8" was the limit but it depends upon the deck manufacturer. it is just good practice.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
chord force in a concrete filled diaphragm huangyhg 产品功能分析 0 2009-09-07 11:37 PM
chord force adjacent to cmu wall huangyhg 产品功能分析 0 2009-09-07 11:37 PM
cantilever flexible diaphragm huangyhg 产品功能分析 0 2009-09-07 10:36 PM
3 sided metal diaphragm huangyhg 产品功能分析 0 2009-09-07 08:37 AM


所有的时间均为北京时间。 现在的时间是 02:20 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多