默认 defective structural slab to be removed

defective structural slab to be removed
hi,
i have a situation with a structure which has three bays of one way spanning structural slabs. one of the end bays has received consistently low compressive strengths based on results (12 mpa) and as such we have instructed the contractor to demolish the slab. the contractor has confirmed that the concrete supplier added several additional gallons of water to the concrete truck for that bay due to a faulty pump and the time that it took them to replace the pump.
tests indicate that the other two bays are ok. my question is how much of the good slab shoulf be removed as well. if we were doing a construction joint then i would have recommended that the joint fall in the middle third of the slab where the shear is less. is it unreasonable to ask the contractor to remove this much of the existing slab? some engineers have advised that i can ask the contractor to demolish from the face of the beam and that the load will be transfered by shear through the reinforcing steel. the bottom steel in several locations does not continue past the beam so i'm wondering if it wise to use it for shear transfer especially since it is a one way slab and the shear as the face of the beam will be the highest.
thanks in advance for you comments.
find a job or post a job opening
i would say that having a vertical shear plane at the face of the supporting beam is a bad idea. lots of shear across it.
what i would do is have the cut occur over the top of the supporting beam, but only cut deep enough to get a good edge on the concrete, then have the contractor hand chip the remainder, creating a small ledge and leaving the original top bars and any bottom bars that might be continuous into the adjoining slab.
the ledge width doesn't have to be much but we usually kept it to a minimum of 1 1/2" (40mm).
so you are essentially just removing concrete and trying to keep the rebar in place. your replacement slab will then rest over the top of the beam
thanks jae,
i can't help but think that part of the beam needs to be removed as well. if that is the case, what is your advice.
thanks
shore up the remaining slab and have the joint occur on the other side of the "new" beam. again, if possible, keep as much of the reinforcing that extends from slab to slab in place and intact.
--------------------------------------
new slab | exist. slab
|
------------ --------------
| |
| |
| |
| | <---new beam
| |
| |
| |
-------------
thanks
dont forget to shore the adjacent spans, or they will sag due to the lack of continuity (and you will never get it out).
when i have done this i have called up for the slab to be saw cut at the end of the top bar development length and then hand chipped for the remainder.
i agree with jae's comments.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cracks in two-way flat slab huangyhg 产品功能分析 0 2009-09-08 02:29 PM
crack in old floor slab huangyhg 产品功能分析 0 2009-09-08 02:20 PM
control joints in structural slab on grade huangyhg 产品功能分析 0 2009-09-08 01:47 PM
control joint in structural slab on voidform huangyhg 产品功能分析 0 2009-09-08 01:44 PM
concrete spec. for slab-on-grade huangyhg 产品功能分析 0 2009-09-08 12:49 PM


所有的时间均为北京时间。 现在的时间是 04:09 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多