默认 cutting every other bar at cc joints

cutting every other bar at cc joints
does anyone here construct his or her slab on grade details to show every other bar being cut at crack control joints before the slab is placed? say if you schedule #3@12" ew and at the ccj you cut the bars before concrete is placed thus decreasing your area of steel across the joint to #3@24".

tia
check out our whitepaper library.
i specify that every third bar be continuous thru a sawed joint, but not thru a keyed construction joint. i tried every other bar, but cracks sometimes formed adjacent the sawed joint. never knew for sure if it was because the contractor sawed the joint too late or just too many bars thru the joint. but, since doing every third bar, have not had the same problem.
i would think that amount of steel across your control joint may still defeat the purpose, usually with wwf the alternate cross wires are cut. if i have rebar reinforcing, i end up with a smoothed doweled joint, greased one end.
i've used the smooth dowels (basket dowels), also. as a ve item on one project, the owner and architect agreed to eliminate basket dowels for every other deformed bar continuous thru the joint with my concern about cracks forming elsewhere besides along the joints. the bars were spaced at 16" o.c. each way, so the continuous bars were at 32" o.c. thru the joint. that job went well, so tried it on a few more with the occasional extra crack results described above. now i'm using "every third bar" being approx. 48" o.c. and so far so good.
archeng59,
can you tell me where aci or pca recommmends this practice?
thanks,
str04
i like the every third bar, ever use it on a more heavily reinforced slab?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cut horizontal bars at wall construction joints huangyhg 产品功能分析 0 2009-09-08 04:17 PM
construction joints in conc pedestrian tunnel huangyhg 产品功能分析 0 2009-09-08 01:27 PM
concrete tanks - vertical construction joints in walls huangyhg 产品功能分析 0 2009-09-08 12:55 PM
国家标准全文数据库系统-机械卷 共计 3143 个标准 taobao American standards 0 2009-04-26 08:55 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 08:15 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多