几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 04:17 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 cut double tee stem

cut double tee stem
has anyone sucessfully seen a cut stem of a double tee? i have a double tee roof that needs to have the stems of the tees cut for an elevator. the stems will be supported where they are cut and the span is signifigantly reduced. i have a design that considers the structural integrity of the tee's to be non-existent after they are cut and i have steel framing designed to re-support this area.
however... if it turns out the existing tees have a straight strand pattern (meaning the strands are in the same position throughout the length of the double tee, as opposed to a draped strand pattern) the structural property of the tee will remain un-changed and the shorter span will give that much more capacity.
thoughts anyone?
to my knowledge, drapes are only used for post-tensioned members, not prestressed
thanks spats. maybe "draped" is the wrong word. the strand patterns for these
i think you need to know the strand configuration to intelligently make your decision. the strands in a double tee could be either straight or deviated. i don't think that double tees are ever made like hollow core slabs, in continuous castings and cut to length.
i didn't mean to imply the tee's were made like hollow core slabs, but rather, if the hollow core slabs are pre-stressed, cast in one long sheet, then cut to length; it is reasonable to expect a double tee with a straight strand pattern to be able to be supported in two places, have a small section cut out, and still have integrity in the un-molested areas.
yes, i agree.
you should also consider that if the strands are straight (not harped) then some of them (usually near the bottom) may be debonded at the ends. this would have been used to vary the prestress eccentricity to reduce tensile stress at transfer. these debonded strands may become ineffective if the remaining length of beam is too short. of course they may not be required with the shorter span.
also, cutting the beam will probably eliminate most of the prestress camber. at the actual opening you can simple set the steel framing tight to the existing soffit to avoid movement at that point. this may still have some effect on the existing beam profile in the remaining spans if they're long enough. may be negligible but worth considering as it may result in some cracking.

double tees are either made with straight strands (and sometimes with debonding for cases with lots of strands) or with draped strands (typically done at mid-span).
don't take the pci charts as gospel, only as a guide - you are better to try and investigate which of your local producers may have made the dt's - you'd be surprised they may still have shop dwgs for the double tees.
scanning the legs of the double tees is a good idea, even if you have the shop dwgs as sometimes production may change the strands and it gets handled by an internal memo.
you probably could still check the strands as stressed rather than reinforced - if your loads are all udl loads and the span isn't too short (so the strands can't fully develop) i'd be ok with it.
hopefully, the tendons are bonded, and not unbonded.
mike mccann
mmc engineering
mike,
if you mean the entire length of the strands, i don't think double tees are ever made with unbonded tendons. the strands are often unbonded for short lengths for the reason given by coopdbm and to avoid high splitting stresses.
thank you all. i really appreciate the input. i will x-ray the strands at the ends of the tee and at the areas of cutting. will the un-bonded strands be in a metal sleeve? i will obviously look at the ends of the cut to see if the strands are un-bonded, and monitor the tee's performance during construction.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
【转帖】模拟南方软件下polyline线的输入(并进行修改),不敢独享 - 精华帖集合 yang686526 ObjectARX(VB.NET/C#) 0 2009-04-29 05:37 PM
【转帖】在vba里由基本三角函数导出的三角函数 yang686526 数据库ObjectDBX 0 2009-04-28 12:25 PM
在vba里由基本三角函数导出的三角函数 yang686526 ObjectARX(AutoLISP) 0 2009-04-26 06:33 PM
【转帖】怎么判断对象是否被删除 yang686526 ObjectARX(VB.NET/C#) 0 2009-04-21 12:33 PM


所有的时间均为北京时间。 现在的时间是 02:44 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多