几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 01:23 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 constructing columns in water

constructing columns in water
does anyone have any resources on construction in water. (lake or pond.) i am working on a project that the civil wants to use auger cast piles. i've always used driven timber piles. this part of the project is a fishing pier in a state park.
any suggestions on construction material, suggestion method for the contractor, and/or shoreline disturbance requirements?
thanks.
why not use driven concrete piles?
how would you connect to an augercast pile under water? would you use divers?
i would say, use a driven pile also. though i am curious about the connectin detail.
or concrete filled steel tubes piles?
you will have to use a coffer dam. very typical in bridge engineering
if the civil / architect wants to see an exposed concrete pile above the waterline, then use a driven 8" diameter steel pipe pile as a form. auger out the material in the pipe pile. fill the pipe pile with the appropriate reinforcing and pour the pile to the height desired above the waterline. once the concrete has cured, cut off the pipe pile form at the mudline with an underwater torch. should be able to cast in place any attachment required at the top of the pile for the pier.
only problem here i see is whether the local building department/corps of engineers/epa will allow you to place piling at that location (eelgrass, etc.). might turn out to be an environmental problem, not an engineering one.
mike mccann
mccann engineering
msquared48,
my question to you, after cut off of the pile at mudline, how will it be possible to strip the steel pipe pile without breaking the concrete inside?
cut all around the ontside of the pile at the mudline, then make two vertical cutes to the top of the pile, 180 degrees apart. should come off at that point. may even be able to pry it open and lift it off with only one vertical cut. had to do this 25 years ago when a section of 8" diameter pile got stuck to the head of a piledriver. smaller problem then, but same basic idea now. should work.
mike mccann
mccann engineering
msquared48,
i think the idea is okay for just one pile, but extremely costly for a project that will require more than one pile. also, the heat during torching may affect the quality of the concrete.
hey...this is a government job. who worries about cost when the government pays $500.00 for a screwdriver? obviously not the gao! or was that $5000.00?
seriously though, i would not be worried about heating up the concrete too much with all the water in the vicinity. how many pile are involved, and how far do they project above the mudline on average?
mike mccann
mccann engineering
cofferdam too expensive.
i doubt the cutting off the steel pipe is a very good idea. i also doubt there is any such thing as an underwater torch - i think the only option is arc-air gouging.
why not leave the pipe in place, if you really have to remove then you should make it up into a bolt together formwork in the first place.
i would go for driven timber, steel or concrete piles. if the auger is a must then a steel casing (or formwork as mentioned above)could be pushed in and then auger through the void.
during concrete i would expect bentonite to be used, if not i can only imagine what sort of condition the concrete will be in.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
coninuous steel beams over columns huangyhg 产品功能分析 0 2009-09-08 01:09 PM
braced and unbraced columns huangyhg 产品功能分析 0 2009-09-07 04:36 PM
basement design - predicting water table level huangyhg 产品功能分析 0 2009-09-07 02:31 PM
aluminium ladder inside water tank - please help huangyhg 产品功能分析 0 2009-09-07 11:12 AM
5 story basement, 30 below water table huangyhg 产品功能分析 0 2009-09-07 08:50 AM


所有的时间均为北京时间。 现在的时间是 06:44 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多