默认 concrete spalling

concrete spalling
i have an existing concrete beam (interior) that is subject to constant high temperatures (around 142f, 62c). at the interface between the roof deck and the beam, concrete is spalling from the face of the beam. there is no visible stress cracks on the surface of the beam, the beam has not been subject to a fire, yet the spalling does not extend to the reinforcing steel within. the concrete used was normal density concrete, 5000#/si. concrete cover to the steel was to be 2". the depth of the spalls are less than 2" in many areas, and where they extend deeper into the beam 2-2.5", no rebar has been exposed.
any ideas as to the cause of the concrete spalling?
find a job or post a job opening
per your exposition it looks it should be something thermal, but who knows. maybe radiative cooling from the deck causes stresses enough against the main body of the beam to eject the part at incompatible temperature.
it could be a lot of things; thermal effect as ishvaaag stated; freeze-thaw? carbonation? intermittent spots where the concrete was not properly consolidated.
can you tap the spalled areas with a hammer? if the area has a hollow sound it's possible that the rebar is corroding, which is a cause for spalling.
do you have any photos?
is the 142 degrees the room temperature or the temperature of the concrete at the roof level? is there any constant circulation?
what is the average humidity in the area? the warmer air will hold more moisture that could condense on cooler exterior surfaces.
dick
the beam and underside of the deck are exposed to the same temperature in your description. the top side of the deck is exposed to a different temperature and a gradient several times per day.
it is likely that your spalling is caused by differential movement. freeze thaw isn't at play here and carbonation is a possibility, but the depth of spalling is too deep to be primarily influenced by carbonation.
the 142f is not high enough to create an issue with the concrete and also is not high enough to cause sufficient vapor pressure interstitially in the concrete to cause spalling, unless there is some microcracking that occurred during the curing process.
look at the face of the spalled pieces. if the face shows that the coarse aggregate is fractured, then it is likely that external shearing forces are at work (as the differential movement previously described). if the face shows that the aggregate did not fracture and that the paste pulled from around it, you could have a placement issue, an initial curing issue, contaminated aggregate, or several other mechanisms.
as bridgebuster suggested, a few photos would help.

the area never gets cold - it is in a co-generator plant. the heat never gets hotter than about 145f. due to the location of the beam in proximity to the mechanical equipment it is very difficult to get close to the spalls. i will upload a couple of photos.
another photo
any chance whatever the beam supports is moving due to thermal change and 'pulling' the concrete off the face?
dik
no. there is no sign of movement of the beam. the spalling appears only on one side of the beam, and the beam is 24" x 32"high.
is there a plastic file on the underside of the deck? do you know how long after the concrete placement the spall appeared?
in picture 8, i see a white streak above the spall; that's a somewhat common occurrence in bridge deck construction - a pattern of white lines perpendicular to the stringer/girders. it generally indicates there was too much water in the mix causing the minerals to leach out. back to the picture, i don't see any fractured aggregate or paste; for the time being i think it's a placement problem.
i tend to agree with bridgebuster on this. the spalling is near the surface and is mostly a paste spall, indicating a lot of laitance at the beam form. the lack of coarse aggregate involvement shows this to be the case.
check one of the spalled pieces. you'll probably find that it has little or no coarse aggregate in it. there's a good chance that the initial fracture took place when the beam forms were pulled...it just took a while for it to fall off.
if my observations are correct, it is a placement issue as bridgebuster said.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete sampling guidlines huangyhg 产品功能分析 0 2009-09-08 12:34 PM
concrete roof slab load huangyhg 产品功能分析 0 2009-09-08 12:34 PM
concrete mix= reinfocing for exterior composit deck huangyhg 产品功能分析 0 2009-09-08 12:19 PM
concrete corrosion in partial saturated condition huangyhg 产品功能分析 0 2009-09-08 11:54 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM


所有的时间均为北京时间。 现在的时间是 03:17 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多