默认 concrete development length for hook

concrete development length for hook
hello,
i have a job where i have a one-way-slab (8" deep) that needs to be supported by a 6" wide concrete arch beam. my top slab reinforcement is #4 bars at 12" o.c. is there a way to obtain the reinforcement development in a 6" wide member or is there a type of connection that would be considered acceptable. aci says that the absolute minimum development length for a hook is 8 bar diameters or 6". this also made me start thinking about all of the 8" wide concrete walls on condos i see here in florida. 8" really does not provide enough depth for a reasonable development either. is there something i am missing here? any thoughts would be appreciated.

jae is probably the man to answer these questions. if your slab is simply suppoted, there is no reason to get development length? the slab is sitting on the arch beam right?
with 8" walls and smaller diameter bars, it is possible to develop the hook length. obviously with a 6" minimum and 6" walls, you're out of luck.
you can increase the width of the arch, change the support condition to one in which the slab bears on the beam instead of frames into the beam, or change your reinforcing so that you do not need to develop the bars.
it sounds to me like this is a pinned end condition--no moment will develop in the slab, and so no development of the top bars is required.
daveatkins
for standard hooks it looks like you will have to meet the minimums, but like said it was said above, it may not even apply for your case. as a side, i am not sure about bars that are bent in hooks that extend further.
for example, i know the standard tilt-up concrete wall has dowels that connect the walls to the slab at 1'-0" on center or some such spacing. but some tilt walls i have seen are only 6" thick so you can't get the std hook development length. the dowels (example #4 bars) are bent up into the wall then extend up into the wall further 18 or 24". so i am not sure if aci allows you to treat the hooked part of the dowel as if it were the same as a straight bar being developed in tension, therefore giving the full development of the hooked dowels.
try something like the lenton terminator (search on google). it works kind of like a headed anchor bolt that screws onto the end of the rebar.
i'm not sure what the development length for a #4 is, but the development length for a #8 is only 7.25in. i would guess a #4 is significantly less and will possibly work in your situation.
thanks for the ideas. i can make the slab bear on the 6" wide beam instead of framing into it. the opposite side will have to frame into a beam but it is 8" wide. i would have increased the beam size but the architect is set on 6". this was my first post and it is good to know that there is a place engineers (who are supposed to know everything) can ask for help.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete corrosion in partial saturated condition huangyhg 产品功能分析 0 2009-09-08 11:54 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM
capacity of through bolts in concrete huangyhg 产品功能分析 0 2009-09-07 10:53 PM


所有的时间均为北京时间。 现在的时间是 06:08 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多