几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 09:32 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 cmu foundation wall

cmu foundation wall
based on 2000 irc, the masonry stem wall doesn't appear to require any vertical reinforcing (in seismic areas a,b, & c)by code. is this correct? if so, the anchor bolts don't have a continuous load path down to the footing.
i ask as i am investigating a foundation failure, and, the homeowner is out a significant amount of money for what i feel is crappy construction. the anchor bolts didn't cause the failure, but, the mortar joint has separated 2" vertically due to settlement of fill. there are mortar bags stuffed into the cells under each anchor bolt to stop the concrete from completely filling the cell.
i'd really like to burn this guy so any help is appreciated.
if the contractor is at fault, it is for not compacting the fill before pouring the footings. if settlement had not caused the mortar joint to fail in tension, the unreinforced wall would have been able to handle shear parallel to the wall, without being grouted full height.
daveatkins
i agree with daveatkins, the failure is the fault of whom ever failed to compact the footing subgrade fill.
it is important to blame the correct culprit!
i agree on the culprit, and, it is the contractor that is responsible for compacting the fill. just used their backhoe to compact. we've gotten a lot of rain due to francis and then ivan. it appears the sub-surface flow of water blew out the toe of the fill. i probed this with a penetrometer and it was soft.
the elevation of the house is 3300. because of this, i'm still going to state that there should be vertical rebar at all anchor bolt locations, down to the footing. i'm using the continuous load path requirement due to the wind speed.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cantilever retaining wall or no huangyhg 产品功能分析 0 2009-09-07 10:39 PM
buttress wall relative rigidity huangyhg 产品功能分析 0 2009-09-07 05:57 PM
anchoring an exterior cmu fdn wall to s.o.g huangyhg 产品功能分析 0 2009-09-07 12:05 PM
42 tall cmu firewall huangyhg 产品功能分析 0 2009-09-07 08:47 AM
20 high basement wall and diaphragm huangyhg 产品功能分析 0 2009-09-07 08:23 AM


所有的时间均为北京时间。 现在的时间是 08:04 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多