默认 8 cmu placed w incorrect horizontal joint reinforcing

8" cmu / placed w/ incorrect horizontal joint reinforcing
am inspecting on a project where a quantity of 8" cmu was constructed prior to my arrival. some walls are as high as 20 courses. metal frame building approx. 50' x 100' with 8" cmu with #5 at 48" vert and bond beams at 48" w/ 4#5.
problem: all of the 8" cmu placed and grouted to date appears to contain incorrect horizontal joint reinforcing.
placed: 2 wire ladder type for 12" cmu note: this 2 wire horizontal joint reinforcing was placed so that one of the two wires is on the outside of the 8" cmu to act as a brick tie/anchor.
required: 3 wire ladder type for 8" cmu. this 3 wire horizontal joint reinforcing should have been placed so that one of the three wires is on the outside of the 8" cmu to act as a brick tie/anchor and the other two of three wires are placed in the cmu bed joints.
also, the placed horizontal joint reinforcing does not appear to have the required minimum 6" lap. a quantity of the horizontal joint reinforcing appears to have various laps of 0" to 3".
already reported obs to eor who is now cogitating...but just as a heads-up, other than demo, is there a fix for this?
check out our whitepaper library.
with bars at 48" oc in both directions, the ladder type reinforcement may just be there to attach the veneer. except for extremely high seismic areas, the bars at 48" is enough to confine the cmu.
your eor might just recommend a drilled in anchor system for the veneer.
agreed, drilled-in anchors should solve it!
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
42 tall cmu firewall huangyhg 产品功能分析 0 2009-09-07 08:47 AM
1930s cast-in-place concrete reinforcing huangyhg 产品功能分析 0 2009-09-06 10:39 PM
15 ft cmu chimney design method huangyhg 产品功能分析 0 2009-09-06 10:34 PM


所有的时间均为北京时间。 现在的时间是 01:05 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多