几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-07, 08:55 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 7 day concrete breaks higher than 28 days

7 day concrete breaks higher than 28 days?
we have a concrete mix that we have been having problems with the 7 day breaks breaking higher than the 28 day breaks. the mix is a 6000psi mix with cement factor of 6.7 it uses admixtures of 322n, nc534, and glenium. the cyliners are being cast and stored intially in temperature controlled cure sheds then brought into the lab where they are stripped and put in a temperatured controlled room so we dont believe that cylinders are being overheated intially does anyone have any ideas on what might be causing our strength loss. thanks
find a job or post a job opening
possiblities:
1. sampling procedures? - not too likely if the first yard or so was not sampled.
2. age of concrete (mixed) before sampling - not likely, but you may be able to determine somewhat by examining batching and delivery tickets. the supplier should know when the truck left both the plant and the site.
3. concrete temperature - possible warm temperatures will accellerate early strength gain for high cement contents and have unknown efffects on admixtures. few inspectors and usually no contractors actually check temperaures.
4. cylinder making - very possible depending on the person's qualifications and experience.
5. site curing/storage conditions - approved facilities should be equal for all. only time duration should change (weekends, etc.)
6. cylinder handling - very possible due to the weight and unstable h/t. one early tip can throw out a test. check individual cylinder breaks for the same set to look for erratics.
7. laboratory curing - not likely and conditions are probably recorded.
8. testing laboratory - is the lab certified?
9. sample preparation - possible since lower level technicians may be doing the dirty work, especially in a heavy construction season.
10. testing - possible errors (technician) due to load rate(usually regulated) or inaccurate centering causing eccentric loading (more possible on small size cylinders).
10. wrong mix design - possible but should be verified from batching reports. a wrong mix design/batch proportions could be spotted easier. an error in automatic batching would be unlikely since this is something a plant watches for cost purposes.
in an modern plant, the variable are consrolled more than they are on a construction site - one of the benfits of international cement companies and vertical integration.
just some points from an engineer that inspected and test all the way through school.
dick
just a couple of questions to put things into perspective -
1. are the 28 day breaks below specified? - if so how much?
2. how many sets of cylinders are we talking about?
3. what is the history/performance of the cylinders that following the pattern that is expected?
dick
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
32 story building framed with lightweight concrete huangyhg 产品功能分析 0 2009-09-07 08:40 AM
30mpa parking garage concrete slab vs. 35mpa huangyhg 产品功能分析 0 2009-09-07 08:39 AM
3000 psi concrete requiremen huangyhg 产品功能分析 0 2009-09-07 08:39 AM
28 days compressive strength of concrete in russian concrete huangyhg 产品功能分析 0 2009-09-07 08:34 AM
28 day vs. 56 day concrete breaks huangyhg 产品功能分析 0 2009-09-07 08:34 AM


所有的时间均为北京时间。 现在的时间是 05:17 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多