几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » Norm Space: Product Automatic Standards - 范数空间:产品自动化标准 » National Standards » American standards
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-04-29, 07:38 PM   #1
yang686526
高级会员
 
注册日期: 06-11
帖子: 14579
精华: 1
现金: 224494 标准币
资产: 234494 标准币
yang686526 向着好的方向发展
默认 【转帖】does a tag number change require up revving a drawing

does a tag number change require up revving a drawing?
a change in requirements caused a vessel to be re tagged. there has been some discussion as to whether or not this constitutes an engineering change. my feeling is that it is a drawing change and the revision is for the drawing regardless of the content. so, any change to the drawing requires an up rev.
my colleague contends that up revving the drawing implies an engineering change. if i follow that line of logic then the drawing should be up revved anyway because the tag number appears on "other documents and systems".
unfortunately, i cannot find any standards or contract requirements to resolve this.
does the drawing specify exactly what goes on the tag (i.e. serno 12345) or just that certain information is contained on it, whatever the exact info may be? if the drawing does not specify the exact info, i'm inclined to agree that a drawing change is not needed.
this is based on the limited info presented.
i agree with ewh. if it shows on the dwg, revise it. depending on the info, it may just be a minor rev.
chris
solidworks 07 4.0/pdmworks 07
autocad 06
the drawing does not specify the requirements but there is a contractual requirement for how equipment get tagged. this is in fact why the equipment was re-tagged.
change the drawing, change the rev.
simple as that.
i concur as mintjulep so eloquently put it! (kinda sounded like my old drafting supervisor! *g*)
from the surface of things, it doesn't seem as though the drawing is even a factor. do you feel some content on the drawing should be changing? are you using a plm that requires a revision to role?
matt
cad engineer/ecn analyst
silicon valley, ca
does the drawing specify a tagging method different than the contract? if so, revise.
yang686526离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
【转帖】decimal dimensioningfractional equivalents yang686526 American standards 0 2009-04-29 07:28 PM
【转帖】asme - where to star yang686526 American standards 0 2009-04-29 07:28 PM
【转帖】assembly drawing bom change question yang686526 American standards 0 2009-04-29 06:31 PM
【转帖】change a drawing views display state yang686526 SolidWorks二次开发 0 2009-04-13 09:36 AM
【转帖】how can i insert the serial number note yang686526 SolidWorks二次开发 0 2009-04-12 09:08 PM


所有的时间均为北京时间。 现在的时间是 09:53 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多