主题: wall tie
查看单个帖子
旧 2009-09-16, 06:57 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 wall tie

wall tie
i am currently designing a 40-feet high single story warehouse type concrete building (seismic zone 4). the roof system is open web joist and metal deck (no concrete). i am designing the wall anchorage to the diaphragm at the roof level for the walls running parallel to the open web joist. what details are typically used and analyzed?
check out our whitepaper library.
this is probably a tilt up building which usually has embed plates with headed studs in the panels which are used to weld to the continuous diaphragm ledger angle. this allows the shear transfer parallel to the wall.
some engineers also put in extra steel members in the plane of the diaphragm at this area to make sure the roof panels won't crush from the force coming in perpendicular to the wall.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)