查看单个帖子
旧 2009-09-16, 05:09 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 underpinning with concrete and drypack

underpinning with concrete and drypack
i am specifying underpinning with concrete, with the top 2 inches to be drypacked. should i provide a time interval between the concrete placement and the drypacking work.
i had in mind 4 days from concrete placement to drypacking work (drypacking with non shrink grout) and then additional 3 days for drypack to cure before going to the next set of pins, thus for a total of 7 days.
does concrete shrink only between the time of placement and initial set, or is this a gradual process continuing.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)