查看单个帖子
旧 2009-09-16, 01:04 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 emporary construction loads

temporary construction loads
i am in the process of restoring a concrete parking garage topped with asphalt designed for 2000# concetrated loads (not alot considering weights of asphalt spreaders, rollers and bobcats with filled buckets)
i understand i can allow higher loads during construction (restoration) since they are only temporary. anyone have guidance to such increases allowed or code references pertaining to this?
thanks all!
go purchase asce 37:
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)