主题: shear lag
查看单个帖子
旧 2009-09-15, 09:44 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 shear lag

shear lag
i am trying to calculate concrete breakout strength for a pier that is subjected to shear coming from a shear lag welded to the bottom of the base plate.
aci does not seem to address it and i couldn't find it at the pci handbook either.
can somebody tell me if there is a good reference to follow?
thanks
kris
aisc base plate design guide
aisc design guide 1: base plate and anchor rod design (2006) 2nd edition
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)