查看单个帖子
旧 2009-09-15, 08:00 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 sap2000 9connection to the edge of beam0

sap2000 (connection to the edge of beam)
hey
i have this problem with sap2000 v11
with the command assign> frames> insertion point i fixed the rolled in the down part of the edge of a beam.
thus if afterwards i try to draw a cable in the edge of this beam (but in the up part of the beam) the program automatically begins the designing of this cable from the point that i fixed the rolled (in the up part of beam).
my question is simple:
has the program sap2000 v11 the possibility to have at once in the down part (in the edge of a beam) a rolled fix and in the up part (in the edge of a beam) a beginning of a cable?
follows drawing
thank you
giannis
as far as i know a beam element in fea is just 2 nodes connected by a set of sectional properties. there is no top or bottom node of the beam section. i do beleive that sap has some constraint / offset type tools that might help you to accomplish what you are trying to do.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)