查看单个帖子
旧 2009-09-15, 02:06 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 pre-cast tower crane foundation

pre-cast tower crane foundation
i am currently looking into pre-casting a towercrane foundation so that this can be re-usable.
the towercrane manual usually specifies the foundation details depending on the soil bearing capacity and the tower height.
queries :
1.) are there tips or web sites that you can lead me to learn more on this topic?
2.) what are the things to consider in converting the manual design to pre-cast?
3.) has anyone done this before? how did you go about it?
for all the great tips... thank you!
find a job or post a job opening
how tall is the crane? reach? capacity?
generally speaking, foundation re-use is not practical because of their size and weight -
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)