查看单个帖子
旧 2009-09-15, 12:21 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 pile cap reinforcement above pile

pile cap reinforcement above pile
is it as per aci detailing standard that the pile cap bottom mesh should be 12 inch high and pile steel should enter into pile cap run vertically 12 inch and than bend over pile cap bottom steel.
check out our whitepaper library.
our typical pile/pile cap detail calls for 6" of pile embedment and the bottom mat of rebar another 3" above that. this is based on minimum of 3" cover for concrete formed against and exposed to earth. we typically detail the pile reinforcement running up to the underside of the top mat with a 90 degree hook. in my opinion, the hook would not be absolutely necessary as long as you have enough pile cap depth to develop the vertical pile reinforcement. thus the reason for the hooked bar.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)