查看单个帖子
旧 2009-09-10, 01:40 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 metal decking installation

metal decking installation
anyone out there have experience with using powder-actuated mechanical fasteners for installing metal decking to steel joists. are there any inherent disadvantages to this type of fastening system in lieu of the traditional puddle-welding method?
check out our whitepaper library.
you can fasten steel deck to joist or any steel member via various means such as:
1. puddle welds
2. mechanical fasteners (i.e. tek screws)
3. powder driven fasteners (similar to those hilti and others make)
each of these systems has the good and bad. welding is great and will have large shear capacity, if welded properly. since welding is done on roof tops and is done by bending down and due to the thin nature of the deck, you will tend to have burn through and misalignment of the weld and the supporting steel
hilti's "direct fastening" system is the only one i'm aware of. it's quite a simple way to install floor plate.
you must ensure that the surface treatment on the beam, where the stud penetrates the underside of the top flange, is touched up to avoid future corrosion problems.
oops, i thought you were referring to floor plate when it seems that you are in fact referring to light-gauge decking for composite slabs and formwork...sorry.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)