主题: masonry dowels
查看单个帖子
旧 2009-09-10, 12:37 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 masonry dowels

masonry dowels ??
this is pretty simple question but i can't remember the reference...dowels in masonry walls that start in a lintel beam above an opening should be hooked in the lintel beam, right?

if the lintel beam has shear reinforcing that will be hooked. if the lintel is 16" or less, i would 90 degree bend with a 6" leg any dowels into the lintel. if the lintel is 24", i would not use a bend or hook as the development length in the lintel is long enough. this depends on the type of load seen by the vertical stub bars too. if the bars are connected to holddown (endwall tension steel), definitely hook the bars.
mike mccann
mccann engineering
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)