|
超级版主
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
|
lowering top of grade near ex grade beam
lowering top of grade near ex grade beam
i have a client who wants to reduce finished grade elevation near an existing cip grade beam. frost depth here is 3'. lowering grade will make the existing grade beam bottom (on one side of the beam) to be within 1'-8" of top of fin grade. using traditional underpinning to deepen the grade beam is not feasible because the subgrade is poor fill which will definitely allow the underpinning to settle.
i can dowel to the underside of the grade beam and add concrete
to its bottom, (which will be costly) but wonder what others have done in a similar situation.
sounds like an application for a frost protected shallow foundation. see
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
|