超级版主
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
|
loading for elevated joggingwalking track
loading for elevated jogging/walking track
i've got a project that is an addition to a recreation center. part of the project is the addition of an elevated track for walking and jogging. i've got questions about the appropriate live load to use. my instinct says to use 100psf. asce 7-98 lists 60psf for walkways (other than exitways, i've used 80psf for 2nd story corridors, and i've designed pedestrian bridges for 85psf (aashto). has anybody done an elevated track before? what live load used. this project falls under ibc 2000.
we've used 100 psf for live load. also, paid a lot of attention to vibration - even though its elevated, don't get too light with the floor...you need mass to dampen out the runners.
concur with jae. i am working with the owner of a gymnasium (under construction) that was designed with both an elevated track and a second floor aerobics room. we will find out in few months if the design engineer paid enough attention to the floor vibration issue. here are some links to general information:
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
|