超级版主
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
|
live loads
live loads
i am designing an addition to a church under boca '96. it is to be multi-purpose with offices, classrooms, and corridors. what live loads would you recommend? would you design the whole thing for 80 psf (corridors) so that it can be reconfigured any way for the future?
find a job or post a job opening
i typically use the corridor live load over the entire floor plate for spec office buildings so the floor plan can be reconfigured. for an addition to an existing church building, the owner/tenant is probably on board during the design process and should be consulted first. they may or may not wish to pay for a slightly more conservative design in order to have future flexibility.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
|