查看单个帖子
旧 2009-09-09, 04:54 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 hook development length

hook development length
can someone explain to me 12.5.3 length ldh in 12.5.2 shall be permitted to be multiplied by the following factors.....
i feel like i dont really understand 100% for factors a and b.
not almost anymore!
check out our whitepaper library.
a) for all hooks (180 or 90) the side cover must be at least 2.5 incheses.
for 90 hooks, the cover behind the hook must be at least 2.5"
b)is pretty self explanatory.
these are related more for splitting type failures of the concrete as opposed to actual pull-out.
eit, explain behind the hook. meaning the cover to the left of shape l?
not almost anymore!
no, if you follow the bar from the middle of the
ok, so if this hook is for the dowel at the base of a retaining wall going into the toe, then the minimum concrete cover is 3" because it is againts the earth (no form). does this mean i can multiply this factor?
not almost anymore!
yes
sweet... i cant wait for you to take your pe buddy. you will be a good one.
not almost anymore!
i've got about 2.5 years to go!!
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)