查看单个帖子
旧 2009-09-09, 04:50 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 hollow steel pipe pile in tension

hollow steel pipe pile in tension
what is the best detail for a hollow steel pipe tension pile imbedded in a pile cap. we were going to cap the top with a steel plate to keep concrete from going down the pile. then either weld studs to the side of the pile, say 8 studs, two at each of the four quadrants. or weld rebar to the side of the pile at each of the four quadrants and extend them up to the top mat of reinforcing, terminating with a hook.
anyone have any suggestions?
i'd go with grade 40 rebar welded to the side. however, i would put holes thru the steel cap plate too to insert the rebar thru, and extend the cap plate over the edge by 3" or so all around, or square, designing the plate to take some of the uoplift too. that way the rebar doesn't have to do it all. the rebar should all be encased in concrete too though.
mike mccann
mccann engineering
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)